Answer / pabitra chandra paul
We use cement in concrete as a binder material.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / er. shivam dixit
cement is used in concrete because it attain good strength
rapidly than other binding material
2. cement paste fill all voids in between agregates.
3. cement easily available in any location.
4. cement is water tight, water repellent and not affected
by any weathering agencies.
5. cement create good bonging with all inert material in
concrete.
these are some points because it could not easy to define
why we use cement in concrete because this topic is very
wide and lots of time to explain, i will providing a non
stop 1 hrs lecture on that topic
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / md imranul hassan
cement is cohessive in nature and it work as a binding
material and provide surface area for hydration which bring
the strength for concreting material.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / nadim
It is the cement that binds the sand and gravel or crushed rock together to form what we call concrete
| Is This Answer Correct ? | 3 Yes | 1 No |
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
What is Time period of a building and its relation with frequency ?
how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?
What is missing report and how to prepare
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
how to calculate bottom width of staircase explain briefly
what is the I.S. CODE of RCC
What is tha cross secional area of cover block
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)