why we use cement for concrete
Answers were Sorted based on User's Feedback
Answer / pabitra chandra paul
We use cement in concrete as a binder material.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / er. shivam dixit
cement is used in concrete because it attain good strength
rapidly than other binding material
2. cement paste fill all voids in between agregates.
3. cement easily available in any location.
4. cement is water tight, water repellent and not affected
by any weathering agencies.
5. cement create good bonging with all inert material in
concrete.
these are some points because it could not easy to define
why we use cement in concrete because this topic is very
wide and lots of time to explain, i will providing a non
stop 1 hrs lecture on that topic
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / md imranul hassan
cement is cohessive in nature and it work as a binding
material and provide surface area for hydration which bring
the strength for concreting material.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / nadim
It is the cement that binds the sand and gravel or crushed rock together to form what we call concrete
| Is This Answer Correct ? | 3 Yes | 1 No |
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
how do you calaculate the total steel quantity of an rcc building using thumb rule?
What is specific gravity???
Plz tell how to find out stell bend correction for all angle of bend and in where it is? Plz answer
What is density of crush sand and fine aggregate
how to calculate shuttering measurement of beam and slab
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
how we can calaculate cutting lengh for stiruups 6mm dia . column size 20 cm x 30 cm, cover 20mm
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is mean by Engineers ?
what is C50 expressed in kg/m3
What is yield strength of steel?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)