please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
Is This Answer Correct ? | 2 Yes | 0 No |
how many moisture content in well seasoned timber
please help me to find a mix design ratio for M40....
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
What are the Types Of DPC and its Thickness used?
SHEAR FORCE AND BENDING MOMENT DIAGRAMS
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what are the types of bridges
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
why we can use dust in concrete insted of fly ash