Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)

Answers were Sorted based on User's Feedback



what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / pradeep tk

as volume-----
for 1 m3 concrete, volume=1m3
propotion=1:2:4

ie, volume of cement=1*1/7

=0.142 m3
volume of sand=2*1/7
=.285 m3
volume of aggregate=4*1/7
=0.571 m3

for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3

sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m3

Is This Answer Correct ?    11 Yes 5 No

what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / aamir mushtaq shah

for 1 m3 concrete, volume=1m3
propotion=1:2:4




ie volume of cement = (1/sum or ratios)*1.52*30

6.5 Bags of Cement
volume of sand=
=0.43 m3
volume of aggregate=
=0.86 m3

for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3

sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m

Is This Answer Correct ?    0 Yes 1 No

what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / parminder singh

we consider the 10 cm thick slab and 1 m squre area
volume of slab = .1 cu m
wet concrete volume is same as volume of slab
for .1 cum wet concrete = 1.5 time required dry
material
therefore total dry volume require = 1.5* .1 = .15
volume of cement =.15/7 = 0.0214 cu m
bags = .614
volume of sand = 0.0214*2 = .0428 cu m
volume of course aggregate = .0856 cu m

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????

2 Answers  


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

0 Answers  


How to calculate steel for beam slab and column

0 Answers   IOCL,


how much to get of BRC lapping in full yield and half yield ?

0 Answers   Engtex,


What will be the angle for hook in column ring for column size 600x750 mm bar size 10mm for ring

3 Answers  


Outline ten different ways in which typical bill of quantities can be used?

1 Answers  


What are the materials used in building a gravity dam?

0 Answers  


What is the diff. Between rectangle & parallelogram?

10 Answers  


how will i find leakage in underground?

2 Answers  


What"s the brick size we use in construction?1.190x90x90 2.230x100x75 Which one "s correct?

13 Answers   Jaypee,


what is the difference between volume and weight batching and which is better?

2 Answers   ECCI,


Theemergency provisions of the constitution of india were greatly influenced by: a)the government of india act,1935 b)the constitution of canada c)the weimer constitution of germany d)the constitution of the united states

3 Answers   APPSC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)