what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)
Answer Posted / pradeep tk
as volume-----
for 1 m3 concrete, volume=1m3
propotion=1:2:4
ie, volume of cement=1*1/7
=0.142 m3
volume of sand=2*1/7
=.285 m3
volume of aggregate=4*1/7
=0.571 m3
for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3
sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m3
Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
How to do base isolation for RC framed structure using ETABS software?
how to workable concrete cube test M-25 design mix
how to calculate the density for high density concrete ? or is it same as the density of RC?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
what is flexible and rigid footing?
What is absolute pressure? How absolute pressure is calculated?
Define What is the difference between routing maintenance and major maintenance in school facilities?
How much is the cover for slab?
How to plan a project
can you give me the details of rate analysis of steel and concrete?
List out the types of roofs?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What expenses counted in contingencies and how much it is in related to built-up area of the building.