i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
What is the types of HT motor testing
what's the simultenous maximum demand (SMD)..what the diffrent MD and SMD?
what is the thumb rule for determination resistance of resistor?
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
what is a types of short circuit and what is a types of distance protection tests
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock
What is nyquist contour?
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
What is a surge supressor why its is used in synchronous generators
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??
What is the difference between isolators and electrical circuit breakers?
What are the advantages of stationary armature and rotating field system?