Answer / k.prakashchandra
When the ups voltage = battery voltage,Number of batteries
required = desired back up hours x load /V x AH of each battery
| Is This Answer Correct ? | 1 Yes | 0 No |
Lt motor sfu flashing reasons?
explain safety measures in alternator?
why do we use UPF watt meter in short circuit test of the transformer and LPF watt meter in open circuit test of the transformer
Relay setting for earth fault of reciprocating and centrifugal compressor motor feeder.Setting will be different or same?
why fault current always calculated for 1 seconds?
What happens on the secondary of a 33kV/11kV when one phase of the primary fuse blows?
What do u mean by Line voltage Monitor?Where it is used in a Power system?
Wtat is mean by GHOAST VOLTAGE?
what will happen if delta - star , 400V to 6.6KV step up transformer neutral is not grounded, Neutral is not used but transformer is provided with neutral.
what are pilot cells
why we +ve load distribution in 24v and -ve load distribution in 48volt in the telecom sector.?
what is difference between inductive and reactiveload?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)