Civil Engineering Interview Questions
Questions Answers Views Company eMail

how must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.

CCCL, Gulf Construction, Yamaha, L&T, NHAI, KITECH, Mars Planning Engineering Services, Supertech, Simplex,

15 134089

one cubic meter of concrete contains how much proportions of cement,sand and course aggregate

Ramky, SMEC, APPSC, AB Inc, Arif Builders,

6 11363

What kind of foundations used in block cotton soils


10 13431

what is meant by geosyntahtic system


1 3011

What is the bearing capacity of black cotton soil, normal soil and rock?

Gammon, Mid India,

2 16515

What is reinforced brick masonary and its advantages and applications, arrangement of steel

1 3988

why we are using 190x90x90 mm of brick size?


3 9722

what is mean by bitumen emulsion

1 3252

Which foundation is stronger, Pile or Standard?

6 4713

how to prepare analysis of hire charges for 62.5 KVA generator

1 5678

why breadth of beam is shorter than (or equal to )its depth?


8 18516

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?

HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,

12 51897

when will the position neutral axis shifted in beams

3 7130

How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.


2 10148

Types of pipes?

6 7200

Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.


what discoveries did you have in relation to your course?


what is right & short method of measurement of slab&beam


how much tempareture are required to make liquid state of pid leed


What applicable rate of wct in bihar


Can we use the flyash bricks in brick bat coba?


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data


how to nfind out the specific gravity of sand.aggregate,water please help...


How to arrive d*d/162 , for finding the kg per meter , wt of steel


how to create our resume?


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building


Use of coping on terrace wall and in 4" wall is compulsory or not ?


hi, i am doing my third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?