How to identify the vitrified tile and ceramic tile by observation only after executing the job.
1052Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
1157A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
2311What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
2360Post New Civil Engineering Questions
What are some facts about concrete?
why the openings of sieves are square io size?
Define What is passive earth pressure ?
how to calculate mivan shuttering matrial
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Formula for calculation volume of essentric footing
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
What are the applications of cad?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What are the responsibilities of a site manager?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
explain fie benefits of using standard terminology in the measurement process
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
what is the formula to find the diagonal shape stirrups?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??