Civil Engineering Interview Questions
Questions Answers Views Company eMail

The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

1176

explain kn/sqm in detail.

3 5192

define prestressing? compare prestressing with post tensioning?

2 4929




for pretensioning which will yield first and same for post tensioning?

777

what is the size of 50 kg cement bag ? gunny & paper

NTPC,

9 48845

how many nos of hacking over concrete surface required for 1 sq m area

L&T, Creative Turnkey Projects,

12 21684

which type of materials should be used for framed structure???

9 5446

What is the difference between normal brick & concrete hollow blocks in all aspects?

L&T, DMU, BTP, PSC,

4 17412




Write short note on construction programme for pile foundation.

3968

what is tmc ,term is used in measureing water, pls tell me 1 tmc = how many litres?

IVRCL, College School Exams Tests, Irrigation, IT Consulting Services,

18 205565

what is the ingrediants of wet mix macadam?construction procedure?

5 45219

WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?

4 4516

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

ACC, Bitulink, Awasthi Construction, SOT, Mir Akhter Hossain,

10 76441

what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?

3 8703

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4.

HRL, NCC, Gulf Construction, mWorkspace, ARS, College School Exams Tests, URC Construction,

15 94803


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.

1456


mean of NH4 pipe

1179


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

664


how many litres of enamel paint required for 5000 sft of site?? 

568


what is difference between fluidity and workability also how palsticizer works

4503






how to calculate valuation for the old building?

940


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

105


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

1126


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

934


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

972


why does the most of civil engg is not intersted to going for teaching field?

745


plz.show development and anchorage length in simple diagram.

1193


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

1465


what is mcArther pile?

1314


Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

815