can i get hindi version of is codes based on civil engineering?

Cosmos, H Reck Engineers,

4013

i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1684

Which is code is used for measurmenr of reinforcement steel work.

CIL,

5 8031

Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

2071

Which IS code is used for scrap of reinforcement steel?

1 6245

please describe clear cover in column from stirups to face

5 7365

1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?

3 4908

what is the formula to calculate costing of rubble soling and wbm in road works?

1 10630

External staircase area outside the independant house includes in plinth area or not?

1 3745

plz drive the formula d2/162.162 for the calculation of weight of steel bars????

Adani,

4 37036

step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

2089

how can we calculate steel value, depending on load

1805

What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.

4628

how can we calculate steel value, depending on load

1925

2nd and 4rt angle elevation used in which country ?

L&T,

1962


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

what is education Cess.

1870


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2191


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2242


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1865


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1465






What are new methods /technologies of pothole patching?

2030


what is the meaning of degreasing of the euipment or line.

3537


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

1710


what is called Bulk Density of aggregate?

1563


sir please send me campus placement questions in civil engineering

3261


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1144


What is change order request?

810


if the nitrates more than 45mg/l in water lead to disease then what is it called

2531


What is the diff between cad & cadd?

768