when will the position neutral axis shifted in beams
Answers were Sorted based on User's Feedback
Answer / mkg
For a balance section neutral axis is fixed based on steel Fe415 or Fe 500 and concrete final crushing strength.
When section is under reinforced NA shift upward.
When section is over reinforced NA shifts down wards
Is This Answer Correct ? | 4 Yes | 0 No |
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is an ice dam sock?
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
what is the unit weight of steel(kg/cum)& unit weight of concrete in(kg/cum)?
What is different type of bills?
what is grade intersection?
HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.
What is meaning of tlc
# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not