How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the difference between routing maintenance and major maintenance in school facilities?
Define block?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What will you do if you encounter problems like accidents?
If specific gravity of cement is less than 3.15 what is the cause?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What is critical path method (c.p.m)?
what is called the inverd level of mabhole chamber?
What is the Roll of Water Bonding under VDF road?
what is thumb rule for calculating the size of ISMB required for a particular length of span
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
what else we can add rather than admixture in concrete to reduce the cement quantity?