how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20
L&T,
22 1052431) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
2699How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
HCC,
10471which member is very strong (strength) after the cross- section area is same, pipe section or solid rod section ? no that's not my question, my question is why pipe section is strong ?
2 6312I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
6078Post New Civil Engineering Questions
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
which steel is better for residential building tmt steel or hysd steel
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
how u design STAGING for Superstructure in BRIDGE construction?
what is stressing
What is Base Shear ?
what r the precaution for high in atp tempareture,low in atp tempareture
what is work of planning deptt. in any construction compny (in road project)
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
How many mortar required for Brickwork of 1 Cu.m works??
What is kn measurement?
IS code for Rolling Margin of steel
what is diffrence between catchment area,watershed and basin?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.