What is the cost difference between site mix and ready mix concrete per cubic meter
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
What you understand by richter scale?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Why the finite element method is lower bound solution?
How to calculate the load of partion in flat slab if we use brick?
Explain the Strength of brick?
how to workable concrete cube test M-25 design mix
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how to find out hard strata in bored pile when the DMC method adopted.
what is the difference between natural draught cooling tower and induced draught cooling tower
what is tension footing?
what is escalation?how it is done?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to control PQI (Project Quality Index)