which member is very strong (strength) after the cross-
section area is same, pipe section or solid rod section ?
no that's not my question, my question is why pipe section
is strong ?
Answers were Sorted based on User's Feedback
Answer / raghuram
HALLOW SECTIONS ie, PIPES OR ANT OTHER ARE STRONGER BECAUSE
THEY HAVE HIGHER Z(SECTION MODULUS) COMPARED TO SOLID
SECTIONS. Z=I/Y............................
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / jayshankar dwivedi
Pipe section . Momemt of Innertia of pipe section is more
as compared to solid section , so its bending capcity will
be more as compared to solid section
| Is This Answer Correct ? | 1 Yes | 5 No |
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
what is the standard size of brick available in site in mm
can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz
what is the difference between natural draught cooling tower and induced draught cooling tower
What is RCC grade of NP 2 hume pipe, Dia and arrangement of reinforcement in it?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
1 Answers Anish Constructions, STUP Consultants Pvt Ltd,
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Specific gravity of cement?
How can I make justification between using concrete grade c35 compare c37?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)