In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
7 14096How to calculate lap,bond and hook length for preparing bar Bending schedule ?
L&T, Saudi Aramco Shell Refinery Company SASREF, Sunil Hitech Engineers, Tempus, Zain United Arabian,
11 143430what is difference between curtain walling and glazing and spider system which are using in building external finish systems.
2 9770which grades of concrete is used in mega structures and well known structures? please name the structures and show their grade of concrete.
6 13893pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
3196Post New Civil Engineering Questions
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What are the disadvantages while using stone dust as filler in pavements?
trapozidal
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
what is w/c ratio in dry lean concrete for m10 mix design
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
What is dead load impact load live load
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is missing report and how to prepare
How to find the cuplock pipe qty in staging for Minor bridge?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?