Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why?
2 5112What is the Frequency while we step up the voltage from 220V to 11KV? Is it possible? Explain it?
6 9827How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?
3 7679Why do we generate 3 Phase AC Supply? It is possible to generate 4 Phase and 5 Phase explain it?
4 10233
What is the Import Procurement Cycle ? and what are the customization steps in SAP ?
i want use the cable size 16cx4 core aluminium usege watts 240x2000w this cable size is correct?
Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.
why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.
from generating station If 400v LT line length is 1000m how much voltage is drop and how do i calculate it? which cable will be use for this line?
what is role of b.tech biotechnology student in pharma compenies?
Is knowledge of properties of engineering materials is significant in pattern making why?
What is sample and counter sample?
what is the AC Plant and how can do the work with parts and picture tell us 150 Tr
WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?
i need to know abt renault nissan company and the rounds and type of questions asked by today
How to prepare electrical preventive maintenance plan & shedule of machine tools in manufacturing unit.
How do I interpret visible satellite pictures?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
draw 3 phase rectifier diagram