Bcoz the form factor is multipl of 1.11 for sinsoidal wave(AC)
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / tharanidharan a
1.1 is form factor of a Sine wave...hence ac voltage being
a sine wave holds Form Factor of 1.1, which
is the ratio of rms value to average value of alternating
current.so generation of ac voltage is in multiple of 11,
like 11kv,33kv,44kv,66kv etc
| Is This Answer Correct ? | 3 Yes | 0 No |
what need of NGR(neutral grounding registor)? What it works?
In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because
why VCB always installed only at HT yards or HT side? suppose if ACB installed at there means, what will be problem?
Why mostly conductor made by 7 nos wire?
how to measure the voltage drop in cables also give formulas to calculate.
What safety followup during kWh meter isolation
In the transformer, in which form we see the losses of transfprmer ?
What happen if an alternator rotates in reverse direction?
what is the last range of mccb in amp?
explain me how a power factor is improved by adding a capacitor?what capacitor do to improve it?in simple words and in detail?thx
Which Motor used in Fan's Motor ?
3 Answers Matsui Technologies,
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)