Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) How to identify Motor leads in their order coming out from winding without tag (U1, V1, W1 & U2, V2, W2)?
ABB,
6 51266Why we use Y-Y connection in power transformer (8-10 MVA, 132 kV to 11 KV)and D-y in distribution transformer (2 MVA, 11 KV to 440 Volts)?
4 11642For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?
1945why Lightning arrestor are made by 2 seperate stack of inslutor but why cvt are in single stack of insulator.
1978why lightning arrestor are made by 2 stack of insulator but why cvt are fully 1 stack of insulator.
1 4190How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
2149
RRB exam qustions.
what are the differant std sizes of cable trenches?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
What was the weight of bhaskara?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
You are of electrical field and you are going for software? Why
which network topology offers the greatest level of tolerance?
number of I/O devices in siemense plc
What is geo-textile?
how power trnafor from 1 point to another point in bus bar ya transmission line( voltage trnasfer from 1 point to another poin)
Explain how to clean LO
book name for the written test of rrb exam
Explain how can I see where pipes are behind the wall?
what is cyclon seperator and water column?
why does the magnetic balance tests at transformer?