Write a c program to accept two strings of odd lengths 1. take all odd characters from one string & even character from other a and concatenate & produce a string 2. us only one loop & no of times loop will be executed must be determined by length of long string.
1 2094What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.
AES,
1838is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.
1168What will be the output of an alternator ,if the field current is single phase ac supply.
DRDO,
1 2686
What is step up cyclo-converter ?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is reactance, reluctance,capistance, pls give answeer in hinglish and be simply Jo asani we smajh m aa jaye
Tell us what is hem?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
What is the lifespan of rccs?
During FEED, you will have all the information with regards to cable. How will you calculate the MTO for MV and LV Cables? what are your considerations?
Why cad cam is better field against IT field?Is the salary is good in this field and if it so then what is the average salary in this field because I don;t think that salary is good enough in this field.
List three types Level Switches with their working principles
Why are ics more reliable than discrete circuits?
Proximity analysis of coal provides data for a first, general assessment of a coal’s quality and type. What elements it reports ?
what is call handover?
what is the difference between three point staret &four point starter
is there any chart showing the suitable cable size according to AMP and length ? for three phase motors
why do you consider yourself a suitable candidate for this position