Engineering Interview Questions
Questions Answers Views Company eMail

3,12,24,33,_ ,75,150 Find the missed number in this sequence

HCL,

2 18659

How is calculate the cube molt

Godway,

1784

what is differance  between SOE an alarams

BMM,

1 5746

Write a c program to accept two strings of odd lengths 1. take all odd characters from one string & even character from other a and concatenate  & produce a string 2. us only one loop & no of times loop will be executed must be determined by length of long string.

1 2094

how much steel and concrete required for 450 sft slab? tell also the method

1 3002

Any strength is a stress but any stress is not strength

1278

What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.

AES,

1838

can we keep open the secondary of current transformer?

Jyona Power,

1 2233

is dc transformer is possible ?

Jyona Power,

4 3979

is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.

1168

why we generate 11kv power supply in generating station?

DBG, NTPC,

1 3031

how to calculate the steel for 450 sft slab, please tell me the solution method

1 3960

what will be the effect if you were using different brands of outlets?

TESDA,

1466

What will be the output of an alternator ,if the field current is single phase ac supply.

DRDO,

1 2686

Question about ct secondaries connections?

1 2195


Un-Answered Questions { Engineering }

What is step up cyclo-converter ?

646


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1374


What is reactance, reluctance,capistance, pls give answeer in hinglish and be simply Jo asani we smajh m aa jaye

1569


Tell us what is hem?

1


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

1735






What is the lifespan of rccs?

584


During FEED, you will have all the information with regards to cable. How will you calculate the MTO for MV and LV Cables? what are your considerations?

2023


Why cad cam is better field against IT field?Is the salary is good in this field and if it so then what is the average salary in this field because I don;t think that salary is good enough in this field.

1481


List three types Level Switches with their working principles

1623


Why are ics more reliable than discrete circuits?

599


Proximity analysis of coal provides data for a first, general assessment of a coal’s quality and type. What elements it reports ?

611


what is call handover?

1814


what is the difference between three point staret &four point starter

1538


is there any chart showing the suitable cable size according to AMP and length ? for three phase motors

943


why do you consider yourself a suitable candidate for this position

6970