how much steel and concrete required for 450 sft slab? tell also the method
Answer / tyrin lannister
generally 1 sft consumes 4-5 kgs of iron, so 450 sft x approx 4 kgs , 450x4=1,800 kgs of iron.
| Is This Answer Correct ? | 5 Yes | 0 No |
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
Please give me the mixing ratio for higher grades of concrete (M30, M35, M40, M45, M50) using cement, VSI sand (Maharashtra) and metal. In case any other additives are supposed to be added to my concrete please let me know about that as well.
Differenciate between One way slab and two way slab
What is Flat/Canceled beam, What is difference between them? can bear same load? kindly suggest me
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
What is the zero value in quantity surveying
How to decide the thickness of reinforcement concrete roof slab? what"s the thickness in inches the roof of 10'x10'? pls give me the answer and give the formula how to calculate it?
what is 43 and 53 grade of cement? that 43 & 53 represents what?
what is slump
5 Answers JMC Projects, Puravankara,
What is the bearing capacity of black cotton soil, normal soil and rock?
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)