Engineering AllOther (1379) Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
2405why 3 phase is converted into 2 phase using electronics circuit why not 2 phases are diresctly putted from the 3 phase transformer??
2187I have calculated load for an office building which is 1200 KW as all the load is single phase therefore its 1200 kw single phase. Now i have to design Transformer and Generator for this load Please kindly give me exact answer that how much capacity of Three Phase Transformer and Three Phase Generator is required for this load.
3 62531)why we are using mostly Ultrasonic Flow meters to measure flow, rather than Radar waves? 2)why we are using Ultrasonic waves and Radar waves to measure the Level?
NTPC,
1 4686
what type of questions pannel ask to the intervier? plz i want questions about computer engineering? System security subject.
what happen if i increase height of displacer type LT.accuracy or sensitivity are affected.why?
How fouling effected the heat transfer rate?
what is elligibility criteria of hcl?
How do You Maintain a structure after getting cube test of low strength.
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
In electronic assembling industry(SMT), what are all the interview questions they will ask while recruiting?
pls what type of questions asked in interview of appsc polytechnic govt lecturers mail to kram.thulasi@gmail.com
When did the name of rakesh sharma’s space vehicle?
how do we calculate length of starting time and repeated starting of a direct online starter?
is Motorola GSM Duplexer active or passive device?
What is the effect of high frequency on its performance?
What is the difference between d-latch and d flip-flop?
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?
Define surge tank.