Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
1875According to conduit size which size wiring & how many wires can we provide wires in conduit & how can we select conduit size accordingly?
1902(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
2043which book is better for written test of a refinery or a chemical industry-o.p gupta or DR.RAM PRASAD?
2 7738What can be a rating of a transformer(KVA) if the load is about 1000KW?illustrate by showing formula?
2 5084
What does f.o.f. Stand for in piping design?
Dear All,I have RRB exam on 19th dec Plz send me the Last 5 years RRB Q&A of Electronics & communication Dept to mail id sham28sharieff@gmail.com.. please frnds if u do have the Q&A.. Plz send it..
What are the methods of reduction of harmonic content?
why star point of HT motor not earthed?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
HOW TO CALCULATE ACCURACY OF AN INSTRUMENT. WHICH IS COMPITABLE FOR USE.
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel
What are the different operation regions of the thyristor (scr)?
Why is it that a single, all – encompassing metric cannot be developed for programme complexity or programme quality?
Can we check ELCB constantly from R1 to R8 phase in 1 no DB?
How can you determine the proper pipe thickness for a slurry line?
if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?
What is polar plot?
What is slope...? Explain slope 1 and slope 2...?
What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.