Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how calculate the electrical load for industry and office

Answers were Sorted based on User's Feedback



how calculate the electrical load for industry and office ..

Answer / raju

p=v.i.cos phi

for 3 phase
p=root 3 v.i.cos pji

Is This Answer Correct ?    8 Yes 2 No

how calculate the electrical load for industry and office ..

Answer / indri priyono

For calculate the electrical load and office can use basic formula P = V.I. cos phi --------------> single phase
P = 3.V.I. cos phi-------------> three phase

Where :
P = Power (Watt)
V = Voltage (Volt)
I = Current (Ampere)
Cos phi = usually range value between 0 ~ 1

Is This Answer Correct ?    5 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Why in medium voltage system(3.3kv to 33kv, neutral is earthed with either resistance, reactance or neutral grounding resistance?

4 Answers   Essar,


Where is servomechanism used?

0 Answers  


Which element is highly conducting coppoer or gold?

3 Answers  


what is the carona effects meaning in HT line transmmission system

0 Answers  


full form of flry b

0 Answers   KPIT,


i need to calulate the cable size when watts are mentaind wat z the formula

1 Answers  


what is the differnce b/w voltage and current

8 Answers   Steel Plant,


What is oil temprature with A/T contacts in Transformer ?

1 Answers  


How much width of the land shall have to be left below the EHT line of 440 kv as per the rule. i am told that a corridor of 35 M width is to be left free below 220 kv line. please confirm

1 Answers  


I have a 5KVA UPS. Total load to be connected almost 3KW. Ordering a battery pack with capacity of 1920VAh. How long will the backup time be?

1 Answers  


will there be any problem by recovering slip from single phase induction motors?

0 Answers  


in what type of applications v can use q meter?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)