Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

What is AVR in Turbo generator in Thermal power plant?

Thermax,

5 24158

Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?

Hindalco,

1994

Hi. I have completed my masters in chemical engineering from M S University in year 2008 and now going to do MS Chemical engineering in Lamar University. I am planning to appear for interview in two weeks from now. What are the expected questions from VO regarding masters after masters ? and wat should i expect to give reply ? kindly give your suggestions. Thanks

1996

In explosive and polluted environments which type of motors do we use?

NTPC,

3 7601

A 230V, 60W bulb when connected to 230v supply what current and power will consume, if same bulb is connected to 200v what purrent and power will consume?

3 8359

what is rated voltage?

1 3669

what does the word synchronous mean in 'synchronous machine'

3 5545

what are eddy currents

2 4634

if suplly 11kva its give 440volts then if suplly is given 10kva whats the volts given

3 5599

why master trip(86) used in eletromagnet?

1 3505

In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

1980

When batteries of different voltages are connected in parallel what happends

ID, Infosys,

4 7221

what is the pile

Chandra Group, GVR Constructions, Simplex,

1 4210

why we step down voltage level from 33kv to 11kv and 11kv to 415v.Instead we can step down voltage from 33kv to 415v directly using single transformer?

3 11478

what is the function of turbo in dg sets

1 3545


Un-Answered Questions { Engineering }

how to control pid

1868


Hi Friends, I am doing engg in comp sc in the final year from the evening college, I don't have experience in technical field. I am working in nontechnical field. I have big question that will IT companies considered me as fresher or they looks experience from me ? if you reply to my query, i am really grateful to you

1856


pls provide me a placement paper for HPCL exam for Elecronics & communication exam. this is a request pls do the needful as early as possible.

1982


The screw thread commonly used for transmission of motion is one of the following types of threads

1108


How to check the thermocouple is correctly connected to cable for K type? (i,e positive pole is connected to non magnetic conductor and negative pole is connected to magnetic conductor)

1656


how can maintain the power factor and why and this is how do work tell us

2047


What is the test block protection relay if any body know plz explained

1424


This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?

2018


In which state sulphur exists at 40 degrees temperature and 40 atmospheric pressure in natural gas having sulphur composition 0.1 ppm?

1625


What is meant by retrace time?

1066


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1946


im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar

1811


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

2163


what will the sending unit in the fuel gauge utilizes?

1854


I am pavani pursuing 4th B.Tech final semester i want to write the Group 2 Examination , Eligibility of that exam is all degree holders but to hold my Degree 3months are more. but the exam held on 3rd July 2012. i would be complete my B.Tech when exam to be held. so am i eligible to Group2 exam or not , please clarify my doubt.

1804