SAP Basis (1262)
SAP ABAP (3939)
SAPScript (236)
SAP SD (Sales & Distribution) (2717)
SAP Security (597)
SAP Interfaces (74)
SAP Netweaver (282)
SAP ALE IDocs (163)
SAP Hybris (132)
SAP HANA (700)
SAP PI (Process Integration) (113)
SAP PO (Process Orchestration) (25)
SAP Ariba (9)
SAP Fiori (45)
SAP EWM (Extended Warehouse Management) (58)
Sap R/3 (150)
SAP SolMan (Solution Manager) (63)
SAP MaxDB (116)
SAP GUI (15)
SAP AllOther (329) Can any body explain me why work scheduling view is required for semi finished and finished products?
1025We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
1150We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
1067What is meant by condition technique? Can we say it is the combination of condition types, access sequence and condition tables?
1118What is erp and sap?and why inplementing sap in an organization? Explain the special features of sap over other
1141
How do u config om and pa?
What is bom usage type for production? : supply chain management
where can we find transport return codes
In SAP Script,How to display a single field(like matnr)at the right end of the form.
In implementation stage tell some standard scenario before AS-Is & TO-BE
What are the different types of luws. What are they?
How can you handle the non-integrated persons by the structural authorization check?
Explain what are adapters?
Define to which organizational element is central in shipping?
Why use sap s/4hana?
difference between base line date and value date?
What are the different methods that can be used to create reports and input schedules in business planning and consolidation?
What are the components of controlling? : co- general controlling
Suppose we have created a PO with qty 100 Ton and we have done MIGO with qty 99 Ton and after that we have MIRO 100 Ton. Interviewer asked me how can we load the difference qty balance of migo and miro (100-99=1ton) on material? please help regards sandeep.
Define stock requirement