Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

HP Oracle Errors Interview Questions
Questions Answers Views Company eMail

ORA-25228: timeout or end-of-fetch during message dequeue from string.string

1 9509

ORA-26094: stream format error: input column overflow

1 2869

RMAN-06009: using target database controlfile instead of recovery catalog

1 6767

Post New HP Oracle Errors Interview Questions


HP Oracle Errors Interview Questions


Un-Answered Questions

Do you know anyone who works with Burlington Coat Factory?

1208


How to calculate VCB rating for 33KV ,25 MW Power line?

1834


How do I know when my thread pool work item has completed?

998


Are jvm’s platform independent?

982


What are the data types present in bo? What happens if we implement view in the designer and report?

1088


What is your favorite game?

1194


Did any one completed CSTE certiication? can u send sample question papers? how to apply that? pls send it to my mail id - dsnathi@gmail.com THANKS IN ADVANCE

2266


SUPPOSSED IF IAM A FRESHER, THEN WHAT SHOULD I ANSWER TO INTERVIEWER. IF HE ASKED "DO YOU HAVE ANY EXPERIENCE"

2459


pls ,send me technical questions of jindal steels and power ltd

2346


Why can be tester dependent on configuration management?

1291


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2253


If you're given a raw data table, how would perform etl (extract, transform, load) with sql to obtain the data in a desired format?

1045


i have applied for junior engg. signal II please send me questions papers for it

2002


What are the advantages of running AI models on IoT devices?

156


Hi, If anyone has base SAS certification dumps, please share.

1951