Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answers were Sorted based on User's Feedback



Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / ashok kumar chaudhary

Dear Sir,

SOLUTION :-

=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.

Is This Answer Correct ?    0 Yes 0 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / anand shinde

h=(D-d)

(D-d)/3x(a1+a2x(under root a1xa2)

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / banambar pradhan

Dear all,

DURING THE PERIOD OF CONSTRUCTION TRAPIZODIAL COMES OVER THE
RECTANGULAR.
FORMULA IS-SQUARE+TRAPEZOIDAL

SQUARE =2X1.7=3.4XDEPTH 0.15=0.51 M3

TRAPEZOIDAL=H/6(A1+A2+4((A1+A2/2)^2))

SO=0.5/6(2^2+A2VALUE NOT GIVEN IN THIS QUESTION+4(2^2+A2
VALUE NOT GIVEN/2)^2))
IF A2 VALUE COULD HAVE GIVEN THEN WE CAN GET THE ANSWER EASILY

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / naresh

u can calculate easily
suppose in trapezoidal footing we always find d &D
D - l * b * h
d- bottom l & b
top l& b after than calculate center of top & bottom
lets define l = 2m b =2m bottom
l = 1m b = 1m top then centre of both 1.5 × 1.5 multiply by half d .

Is This Answer Correct ?    0 Yes 1 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / karthikeyan

Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter

Is This Answer Correct ?    45 Yes 68 No

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quanti..

Answer / mohd.younus ali , je (pr )

Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D

Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D

Is This Answer Correct ?    16 Yes 51 No

Post New Answer

More Civil Engineering Interview Questions

how much dry volume of cement in 1cum in m20 grade

3 Answers  


one litre of shuttering oil how much area covered the shuttering?

5 Answers   UltraTech,


what is the meaning of M & 20

5 Answers  


What is the Unit weight of coarse sand (F.M- 2.20) ?????

0 Answers   BNF Group, TATA,


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

0 Answers  






how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

0 Answers  


HOw many cement bags are required for M35, M40 & M45 grade of concrete?

1 Answers  


what is the quantity of concrete required in 1 cubic meter volume without reinforcement

3 Answers   BLGC, TATA,


why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?

5 Answers   Gammon,


why curing is necessary? Please explain it with detail

2 Answers  


How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?

4 Answers   DLF, Jindal, Secon,


Sunk slab means what ?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)