Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answers were Sorted based on User's Feedback
Answer / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / banambar pradhan
Dear all,
DURING THE PERIOD OF CONSTRUCTION TRAPIZODIAL COMES OVER THE
RECTANGULAR.
FORMULA IS-SQUARE+TRAPEZOIDAL
SQUARE =2X1.7=3.4XDEPTH 0.15=0.51 M3
TRAPEZOIDAL=H/6(A1+A2+4((A1+A2/2)^2))
SO=0.5/6(2^2+A2VALUE NOT GIVEN IN THIS QUESTION+4(2^2+A2
VALUE NOT GIVEN/2)^2))
IF A2 VALUE COULD HAVE GIVEN THEN WE CAN GET THE ANSWER EASILY
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / naresh
u can calculate easily
suppose in trapezoidal footing we always find d &D
D - l * b * h
d- bottom l & b
top l& b after than calculate center of top & bottom
lets define l = 2m b =2m bottom
l = 1m b = 1m top then centre of both 1.5 × 1.5 multiply by half d .
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / karthikeyan
Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter
Is This Answer Correct ? | 45 Yes | 68 No |
Answer / mohd.younus ali , je (pr )
Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D
Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D
Is This Answer Correct ? | 16 Yes | 51 No |
how much dry volume of cement in 1cum in m20 grade
one litre of shuttering oil how much area covered the shuttering?
what is the meaning of M & 20
What is the Unit weight of coarse sand (F.M- 2.20) ?????
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
HOw many cement bags are required for M35, M40 & M45 grade of concrete?
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?
why curing is necessary? Please explain it with detail
How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?
Sunk slab means what ?