Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / karthikeyan

Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter

Is This Answer Correct ?    45 Yes 68 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to do sudoko puzaals?

1831


Define graphics window?

711


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2143


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1495


what is idealized curve for concrere and steel

1865






How much cement and sand required for 9"brick wall per square metre

2486


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

1903


What is aggregate?

737


What was asked in isro civil interview

503


what is the difference b/w full length and cutting length?

1814


can you give me the details of rate analysis of steel and concrete?

2470


what is pouring and explain

1830


What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.

4440


3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.

1635


Define What is diversion tunnel in a dam?

757