Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define graphics window?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
What is dead load impact load live load
What materials were used to build the golden gate bridge?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
List out the potential risk factors for workers on the construction site?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Use of coping on terrace wall and in 4" wall is compulsory or not ?
why is M30 grade Concrete use for Foothing & Column M50