How many cement mortor dry quantity required for 1m3 ?(1:4)..

Answer / pavan

total quantity required would be 1.57 cum of dry mortar,
including 20% wastage.
Dry volume of mortar is 30% more than wet volume.

Is This Answer Correct ?    3 Yes 0 No

How many cement mortor dry quantity required for 1m3 ?(1:4)..

Answer / rehaan khan

For rcc work it will 1'57 cum
For brick masonary '30cum
For plaster work it will 1'60cum..

Is This Answer Correct ?    0 Yes 0 No

How many cement mortor dry quantity required for 1m3 ?(1:4)..

Answer / uttam sasavade

1.6 m3 Dry qty. required for 1 M3.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

0 Answers   Aircel,


The foundations are placed below ground level, to increase?

0 Answers  


what is the difference between TOR & TMT

1 Answers   Wonderla Holidays,


Quick setting cement's setting time?

7 Answers   TNPSC Tamil Nadu Public Service Commission, UPPSC Uttar Pradesh Public Service Commission,


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

1 Answers   NMN,






In which direction is bottom bar of rectangular footing is placed in short or long.

1 Answers   AKC,


how to mack bbs

1 Answers  


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

0 Answers  


what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)

3 Answers  


WHAT DLC DESIGN IN CONSTRUCTION

0 Answers  


Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand

2 Answers  


Define What does civil status mean?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)