Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / mohd.younus ali , je (pr )
Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D
Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D
Is This Answer Correct ? | 16 Yes | 51 No |
Post New Answer View All Answers
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
IS code for Rolling Margin of steel
What does civil engineering mean?
what is idealized curve for concrere and steel
Where is the worlds longest elevator and how long is it?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What Reinforcements Are Used In The Process Of Prestressing?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
residential buildings,mixing of concrete,structural,construction material,site handling.
what do you know that m20,m25
how to remove the quantity of metal 1 and metal 2 in concrete
What is the strength of 1:6:12 mix?