Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / mohd.younus ali , je (pr )

Top Length = L1
Bottom Length = L2
Top Breadth = B1
Bottom Breadth = B2
Depth = D

Then simple formula is
(L1+L2)/2=L
(B1+B2)/2=B
The Quantity of Concrete is = L * B * D

Is This Answer Correct ?    16 Yes 51 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

1646


IS code for Rolling Margin of steel

1914


What does civil engineering mean?

656


what is idealized curve for concrere and steel

1840


Where is the worlds longest elevator and how long is it?

695






1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1932


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1697


Can a wave happen in the middle of the ocean like in the movie poseidon 2006?

691


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1877


What Reinforcements Are Used In The Process Of Prestressing?

841


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

2311


residential buildings,mixing of concrete,structural,construction material,site handling.

2020


what do you know that m20,m25

1399


how to remove the quantity of metal 1 and metal 2 in concrete

1534


What is the strength of 1:6:12 mix?

2600