A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
Answer Posted / sujit
what is block working. if it is brick working or what.
if you want demolishing then you give support for others.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the alternate material for steel, Sand and aggregate
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Will going from a 3-tap to 6-tap increase water pressure?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
(Project Management Topic) What are the important criteria in the successful realization of the project?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how can we construct building without foundation providing only grade beam at ground level
How to construct a water sump in a rocky soil?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
what is the use of beam end forces while using a staad ? wha they are show
Differentiate first angle & third angle projection?
What is need for setting limits?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Define What are the uses of Groynes?
how much of the strength comes from post-production curing