how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M
2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need
What is the per cu. mt. price of ready mix in Gujarat region.?
If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D lap length which dia.should I consider for lapping
how to disign cuplock shuttering and it's matireal requirement snd any related web site
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
Formula of area of crane hook
Define polar co ordinates.
Is 456 revised lastly in which year? & What are the revisions?
how many rods to be require in kg 10sq.m slab?
what is the list of building construction equipment & teir output?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)