what is the permissible safe bearing capacity of soil?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
look bearing capacity of soli depends of soil starta.
permissiable bearing capacity in black cotton soil-10ton/sqm
sand-20-30ton/sqm
morum- 20-45 ton/sqm
etc.
| Is This Answer Correct ? | 15 Yes | 6 No |
Answer / md.nazimul
if it is not lose sand then it will 1000kg per sft.
| Is This Answer Correct ? | 13 Yes | 5 No |
Answer / prashanth
Depends upon the strata of the soil,please let us know the
strata?
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / edakkathlath
Rock:40t/m2
latrite : 20to25t/m2
soil: 10 to12t/m2
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / kaustubh jain
Basically it depends upon type of soil.
If black cotton soil then 160kg/cm2
For others more than this
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / babu lal nayak
120 kn/m2 is the permissible safe bearing capacity of soil.....
| Is This Answer Correct ? | 1 Yes | 3 No |
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
How may digree of freedon in four bar chain.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
what is BOQ? BOQ IS US IN ESTIMATE
What is critical path method (c.p.m)?
what is the list of building construction equipment & teir output?
cement quantity in 1 M3 pcc
Where are u provide laps in columns & beams?
How to calculate 45 degrees bend Steel bar length in Slab Reinforce ment
12 Answers JBS Builders, L&T, Rajarathnam Construction,
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)