how much nails used in 1 sq m shuttering
Answers were Sorted based on User's Feedback
Answer / furqan ansari
Required nails for shuttering .100 to .150 kg./sqm
Is This Answer Correct ? | 179 Yes | 108 No |
Answer / sundarapandiyan
Shuttering qty = 6 X concrete qty
concrete qty= 0.2-0.5 X Buildup area
No of ply wood= 0.22 X shuttering area
nail in kg = 0.22 X shuttering area in sqm
oil 1 lit = 15 sqm coverage.
Is This Answer Correct ? | 52 Yes | 2 No |
Answer / s r s
it is 250Gms/Sqm for New Boards and 150Gms/Sqm for repairing work.
Is This Answer Correct ? | 45 Yes | 6 No |
Answer / sanjeev kumar
250gms to 300gms nails required per m2 shuttering.
Is This Answer Correct ? | 13 Yes | 5 No |
Explain creep?
what is the quantity of sand in litre or in cum using 1 bag cement for morter proportion 1:4.is there consider bulking of sand ?
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
what is the FE415 & FE500?WHAT IS ITS STRENGTH?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?
What are the different grades of concrete ?
what is the constant weight of the 6mm,8mm,10mm,12mm,20mm,25mm etc.............dia bars in 1meter
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
what is the difference between highway and motorway?
What year was the keystone power plant in Indiana County constructed?
how to calculate the scour depth