what is the permissible safe bearing capacity of soil?
Answer Posted / kaustubh jain
Basically it depends upon type of soil.
If black cotton soil then 160kg/cm2
For others more than this
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
For what building Built-on balconies are preferable? What are the advantages?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
What materials were used to build the golden gate bridge?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
why the profile of shell of natural draught cooling tower is hyperabolic.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
for pretensioning which will yield first and same for post tensioning?