what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
No Answer is Posted For this Question
Be the First to Post Answer
Which is quantity of cement in 1 cu.m. concrete of M25 grade
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Specific gravity of Cement? Water?
what are the questions that will be asked in interview in civil engineering
what"s the formula to find the quantity (consumption) of cement,sand,aggregate for 1m3(1:2:4)?
11 Answers ABB, Construction, Isher, L&T, Saudi Oger, Spectra, Strati,
1) what is the use of pin and plate vibrators during slab casting? 2) how much cement bags are required for 1sqm 4inch brick wall? 3) Is it viable to provide overlap at column , beam & slab junction. if no why? 4) if bar dia is changing in column reinforcement , which dia bars overlap is considered? 5) what is isolated and ecentric footing?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
fe415
What is allowable limit of silt in river sand for concrete
What is command line?
What is the civil engineer
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)