With reference to construction of state highways, please let
me know the total Bill Of Quantities as per the following
details:-

1) Subgrade - 500 mm
2) Granular Sub-Base (GSB) - 200 mm
3) Wet Mix Macadam I (WMM I) - 150 mm
4) Wet Mix Macadam II (WMM II) - 100 mm
5) Dense Bituminous Macadam (DBM) - 60 mm
6) Bituminous Crust (BC) - 40 mm

Road Length is 44 Kms.
Road Width is 7 mtrs.

Please provide the BOQ of each layer as per Compacted Factor
& Loose Factor both.

Also, if possible please provide me the approximate details
of total material required (all categories viz. soil,
gravel, stone aggregrate, sand, bitumen etc.) as per general
mix design prevailing in India.

Thanks & Regards
--
Rokr


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

can any one explain bar bending schedule of bems and columns and slabs ??

0 Answers  


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

0 Answers   ACC, DLF, L&T,


How to calculate the quantity of brick or mortar in m3. like in 1m3 brick =....no. .......mortar=....m3

1 Answers   A2Z Infrastructure,


what is tie beam? & its function . uses of tie beam. 

1 Answers   Atlantic Projects,


what is mean by centrifugal force which is act in vehicle on superelevation of road?

3 Answers   Jain Group,






how to calculate length of bar

4 Answers  


uses of M50 and M60 grade ordinary and pozzolona portland cement concrete?

1 Answers  


is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.

1 Answers  


what is difference between active and passive earth pressure. how it effect the retaining wall design ?

4 Answers  


how to calculate the value of 162?

2 Answers   GKC Projects Limited GKCPL, L&T, OPG,


Calculation of curtain wall of box culvert

0 Answers  


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

0 Answers   Gayatri,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)