With reference to construction of state highways, please let
me know the total Bill Of Quantities as per the following
details:-
1) Subgrade - 500 mm
2) Granular Sub-Base (GSB) - 200 mm
3) Wet Mix Macadam I (WMM I) - 150 mm
4) Wet Mix Macadam II (WMM II) - 100 mm
5) Dense Bituminous Macadam (DBM) - 60 mm
6) Bituminous Crust (BC) - 40 mm
Road Length is 44 Kms.
Road Width is 7 mtrs.
Please provide the BOQ of each layer as per Compacted Factor
& Loose Factor both.
Also, if possible please provide me the approximate details
of total material required (all categories viz. soil,
gravel, stone aggregrate, sand, bitumen etc.) as per general
mix design prevailing in India.
Thanks & Regards
--
Rokr
No Answer is Posted For this Question
Be the First to Post Answer
can any one explain bar bending schedule of bems and columns and slabs ??
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
How to calculate the quantity of brick or mortar in m3. like in 1m3 brick =....no. .......mortar=....m3
what is tie beam? & its function . uses of tie beam.
what is mean by centrifugal force which is act in vehicle on superelevation of road?
how to calculate length of bar
uses of M50 and M60 grade ordinary and pozzolona portland cement concrete?
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
what is difference between active and passive earth pressure. how it effect the retaining wall design ?
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
Calculation of curtain wall of box culvert
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.