WHAT IS YOUR CURRENT SALARY
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN WHERE RUN OFF WILL BE HIGHEST?
Defination of civil engineering
what is the code for classification of bricks
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
how to check the quality of concrete
# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
what is procedure of ordinary pile foundation detial?
PL.tell me about civil engineering questions with answer
What is construction mitigation management?
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)