if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
What Are The Different Type Of Slump Test Indications?
What is c.g.i sheet which used for roof??
how many types of hydraulic coefficints and their values
Difference between wbm and gsb in road construction
4 Answers CPWD, GSB, Ircon, JMC Projects, L&T, RD,
concrete coverings outside steel
13 Answers Jain Housing, L&T, Supertech,
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is meant by residual strain?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what are some possible sources of error in the CBR test?
length where bent up is made in slab of bridge from one end
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)