Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to check the quality of concrete

Answers were Sorted based on User's Feedback



how to check the quality of concrete..

Answer / nazrul khan

At site by slump test
at laboratory Cylinder test

Is This Answer Correct ?    20 Yes 1 No

how to check the quality of concrete..

Answer / balamugundan

water cement ratio
size of aggregates used,
temperature, slump, air content, and unit weight.

Is This Answer Correct ?    7 Yes 2 No

how to check the quality of concrete..

Answer / rupesh kumar sahu

Quality of concrete can be checked by CTM AFTER 28 dYs curing.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Explain the mechanism of cavitations in pipes and drains?

0 Answers  


Which purpose we use deck anchor in bridges?

0 Answers  


how to calculate the steel for beams and columns for tender purpose? any formula have?

4 Answers   Ashok Leyland,


Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?

2 Answers  


Why do you want to work here

0 Answers   Ramos Construction,


Cement Co-eff. in block 1:6, brick1:4 work?

2 Answers  


is robosand to be use construction ? for slab ?, wall construction and plastering ?,is it give life?,which is best robosand or river sand ?

4 Answers  


cement quantity in 1 M3 pcc

2 Answers  


What is the main difference between crushing test and impact test in coarse aggregate?

2 Answers   Rites,


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

0 Answers  


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

0 Answers  


what isIS code no for preparation of BAR BENDING SHEDULE (BBS)

4 Answers   BBS, Transstroy,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)