i am also applied for the AAI jr executive (CIVIL) written
test. pls forward me the syllabus & test pattern if any
question papers, any one got reply for this quaries? if ANY
ONE KNOW THE DATES OF WRITTEN EXAM PLZ TOLD ME.
dreamyagrawal@yahoo.com
Answers were Sorted based on User's Feedback
Answer / rakshit
HELLO FRIENDZ I AM RAKSHIT SPEAKING PLEASE HELP ME PUT IF ANY ONE HAS PREVIOUS YESR PAPER THEN MAIL ME TO rakshitkaushik@ymail.com. i think many friends had given the test too as read by me on the same page. so please those frnds are reading this plz help me by mailing the paper at the mail id:-rakshitkaushik@ymail.com
| Is This Answer Correct ? | 1 Yes | 4 No |
Answer / rakesh
i am also applied for the AAI jr executive (CIVIL) written
test. pls forward me the syllabus & test pattern if any
question papers, any one got reply for this quaries? if ANY
ONE KNOW THE DATES OF WRITTEN EXAM PLZ TOLD ME.
rakesh_kund@yahoo.com
| Is This Answer Correct ? | 1 Yes | 8 No |
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
What is thickness of RC hume pipes of size, 300mm, 450mm,600mm
What is limit state method and working stress method and ultimate method
undistributed samples are obtained by
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
What is the acceptance criteria to determine the "Core density" of "DBM or BC" course,for any grade as per "MORTH" guidelines in road construction work ?
What is PQC. Means PQC
14 Answers Era Infra Engineering, L&T,
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
Define What is the meaning of a blue land surveyors flag?
why we take cube depth 150mm for testing
How we calculate the actual diameter of the TMT Steel
8 Answers Brigade, Kalpataru, Simplex,
Quantity calculation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)