Answer / kdg
as a site engineer, you need not check soil bearing capacity
and etc. because the designer has already considered the
bearing capacity during designing. you have to check the
following-
1. the drawings used for survey, shuttering, reinforcement
are of latest revision or not.
2. check the survey report
3. check alignment (co-ordinates) of foundation as per drawing
4. check reinforcement details as per drawing/approved BBS
5. check the dimension of foundation
6. check for PCC top level and RCC top level (as marked in
inner face of shuttering)
7. check for concrete cover at bottom and sides
8. check for alignment of pedestal reinforcement dowels
9. check for tying of rabars specially at every crossings
10. check for de watering, if necessary
11. check for arrangement of manpower, vibrators, access for
pouring etc.
12. if everything is ok, sign the concrete pour card and
proceed for pouring.
11.
| Is This Answer Correct ? | 34 Yes | 1 No |
Answer / nayan
Check RL
Reinf. spacing and cover
Centering & shuttering supports
cleanliness
Plumb check for verticality
Quality of concrete
| Is This Answer Correct ? | 27 Yes | 2 No |
Answer / ankit
soil bearing capacity,type of soil,hard soil availability,near by natural and man made structure affecting soil.other factors may be there ,depending on the site condition.
| Is This Answer Correct ? | 17 Yes | 6 No |
How to calculate the steel for 392c.meter*450c.meter rcc slab
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
briefly describe your ideal job?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
what is the meaning of degreasing of the euipment or line.
What is aggregate?
what is design life of steel structures??
How to calculate the length of chairs provided to support the top rebar in concrete foundation
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How much overlapping required for welding the reinforcement bars in Columns & beams
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
advantage and dis adventagesof using crusher dust insted of sand in rcc works
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)