Answer / kdg
as a site engineer, you need not check soil bearing capacity
and etc. because the designer has already considered the
bearing capacity during designing. you have to check the
following-
1. the drawings used for survey, shuttering, reinforcement
are of latest revision or not.
2. check the survey report
3. check alignment (co-ordinates) of foundation as per drawing
4. check reinforcement details as per drawing/approved BBS
5. check the dimension of foundation
6. check for PCC top level and RCC top level (as marked in
inner face of shuttering)
7. check for concrete cover at bottom and sides
8. check for alignment of pedestal reinforcement dowels
9. check for tying of rabars specially at every crossings
10. check for de watering, if necessary
11. check for arrangement of manpower, vibrators, access for
pouring etc.
12. if everything is ok, sign the concrete pour card and
proceed for pouring.
11.
| Is This Answer Correct ? | 34 Yes | 1 No |
Answer / nayan
Check RL
Reinf. spacing and cover
Centering & shuttering supports
cleanliness
Plumb check for verticality
Quality of concrete
| Is This Answer Correct ? | 27 Yes | 2 No |
Answer / ankit
soil bearing capacity,type of soil,hard soil availability,near by natural and man made structure affecting soil.other factors may be there ,depending on the site condition.
| Is This Answer Correct ? | 17 Yes | 6 No |
std heights of c.p fitting from ffl like health faucet,wall mixer,shower arm,european commod,wall hanging commod etc.
what is curing?
Give open excavation details of Building.
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
castigliano's theorems are based on
what will happen if we pass electric current through rebars of RCC Slab(is there any strength reduction of concrete during this)??????????
2 Answers Precast, SPC Systems,
what is slope provided to floor?
Why we use Reinforcement out side of the column not in centre
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
afe or not
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
In barbending schedule why is o.42*D is taken. Means why o.42 only???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)