Answer / kdg
as a site engineer, you need not check soil bearing capacity
and etc. because the designer has already considered the
bearing capacity during designing. you have to check the
following-
1. the drawings used for survey, shuttering, reinforcement
are of latest revision or not.
2. check the survey report
3. check alignment (co-ordinates) of foundation as per drawing
4. check reinforcement details as per drawing/approved BBS
5. check the dimension of foundation
6. check for PCC top level and RCC top level (as marked in
inner face of shuttering)
7. check for concrete cover at bottom and sides
8. check for alignment of pedestal reinforcement dowels
9. check for tying of rabars specially at every crossings
10. check for de watering, if necessary
11. check for arrangement of manpower, vibrators, access for
pouring etc.
12. if everything is ok, sign the concrete pour card and
proceed for pouring.
11.
Is This Answer Correct ? | 34 Yes | 1 No |
Answer / nayan
Check RL
Reinf. spacing and cover
Centering & shuttering supports
cleanliness
Plumb check for verticality
Quality of concrete
Is This Answer Correct ? | 27 Yes | 2 No |
Answer / ankit
soil bearing capacity,type of soil,hard soil availability,near by natural and man made structure affecting soil.other factors may be there ,depending on the site condition.
Is This Answer Correct ? | 17 Yes | 6 No |
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how can calculate material in 1:1.5:3 ratio in concrete
binding wire requirement in rcc structures
what is the quantity of cement sand and metal in a 1m^3 m15 standard concrete
WHAT IS THE SPLICE LENGTH WHEN WELD IN REINFORCEMENT STEEL
At present which is the latest and best technology for waterproofing in India 1) Roof waterprofing, 2) Basement waterproofing and 3) Toilet waterproofing
why there is no concrete mix of ratio 1:.5:1
The largest size of paper used in plotter to print the drawing made by Autocad .
Cement Co-eff. in block 1:6, brick1:4 work?
can any one explain bar bending schedule of bems and columns and slabs ??
What is rate of concrete surface rendering work per sqm
What cantilever length can be provided safely for Galleries in a multi storey building?