Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO
1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.

Answers were Sorted based on User's Feedback



HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for..

Answer / mohsin

Using a M15 Grade Ratio is 1:2.5:5 & Quantity Is 1m3

Now Add 1.52% Dry Volume In Total Quantity
So 1*1.52=1.52

1.52/8.5=0.178
0.178/0.03472=5.15 Approximate Cement bags.
Sand=0.178*2.5
=0.44m3
Aggricate=0.178*5
=0.89m3

Cost Of Labour Cost Of Material
--------------- ------------------
Mason- 450rs Cement=220*5.15= 1133 rs
Helper-210*2= 420rs Sand=400*0.44= 198 rs
Bhisti= 180rs Aggricate=620*0.89= 551.8 rs
------------------- --------------------------------
Total rs= 1050 Total Rs = 1882.8 Rs
Now Consider the 10% of total quantity...
And 10% Contractors profits

Is This Answer Correct ?    14 Yes 5 No

HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for..

Answer / sivaprakashan

its true

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

What's mean fe of steel?

1 Answers   Fernas Constructions,


what is meant by hidden beam & purpose of hidden beam

2 Answers   Carwell Construction, NTDC,


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

0 Answers  


If drainage is main things then which respect the super Elevation may be provided?

4 Answers  


which chemical is used for corroded steel

3 Answers  


The minimum compressive strength of 1st and 2nd class bricks

1 Answers  


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

0 Answers  


Which apparatus done steel (bar) tension test

1 Answers   Kesri Construction,


how to calculate the size of triangular ring in rcc column?

0 Answers   Prime Perfect Buildcon,


what is specific gravity of soil?

9 Answers  


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

0 Answers  


Water filter calculation formula

0 Answers   Feathers, TCS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)