I've heard that most of the substations are rated in
multiples of 1.11 because of form factor.What is form factor?

Answers were Sorted based on User's Feedback



I've heard that most of the substations are rated in multiples of 1.11 because of form factor...

Answer / vikash

Form Factor= R.M.S value / Average value of current
= 1.11

R.M.S value stands for root mean square. It is defined as DC component of ac current which produces heating effect.

Is This Answer Correct ?    6 Yes 0 No

I've heard that most of the substations are rated in multiples of 1.11 because of form factor...

Answer / prakash

why it is multiple of 11 means 10% considered as line loss
that why all voltage are in multiple of 11 11kv/33kv/66kv

Is This Answer Correct ?    2 Yes 1 No

I've heard that most of the substations are rated in multiples of 1.11 because of form factor...

Answer / pugazhenthi

Form factor=RMS VALUE/AVERAGE
VALUE=1.11

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why reactive power control is required

5 Answers  


to operate air conditioner of 1.5ton what power of generator is required

1 Answers   Bharat,


sail kaott diploma ece ke interviw me qus.kis parkar ke aate hai aur G.S me kya puchate hai kya sameedyaan me kis parkar ke qu.puchate hai

0 Answers   Sail,


At what voltage domestic tubelight works?

2 Answers   Cigfil, L&T, MNC,


explain single phase series motor

0 Answers  






what is the difference between metalhalide and mercury vapour lamp

1 Answers  


Why battery is always operate on dc supply?

1 Answers   Vikram Ispat Industries,


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.

0 Answers  


where is used dc volage transformer,and what is highest capacity of transformer

2 Answers  


whydoes the p.f of diesel generator always be 0.8 explain how will you determine the shortcircuit capacity of network

1 Answers   Dalkia,


why 15 kw motor winding resistance is low then 5 kw motor winding resistance?

0 Answers   Baosteel,


1.what is meaing of ups,and used in softwares and sud stations,and main partes in ups. 2.main partes of the Disel Genarator. 3.main partes of the chiller and safty equipments.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)