I've heard that most of the substations are rated in
multiples of 1.11 because of form factor.What is form factor?
Answer Posted / vikash
Form Factor= R.M.S value / Average value of current
= 1.11
R.M.S value stands for root mean square. It is defined as DC component of ac current which produces heating effect.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
What are the types of class b amplifier?
What is nyquist contour?
do we use neutral grounding for resistive balanced load? if we use what happen?
What is clock position of Transformer?what are the clock positions are there?and what is different of them?
I am using submission of two ct in one and half scheme for 67/67N protection. Both CTs star point is grounded separately near ct box.Will two point ground give wrong tripping to 67/67N during fault or no matter.
DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS
If I want to replace a 26KW Slip ring Motor with a Squirrel Cage motor & Drive (for a Hoist Application). How can I approximate the Motor & Drive HP required in new Setup.
I Have 3 Phase 10 KW AC Alternator i found one phase weak, so what will be the reason & what action shouls i take to rectify the same.
why a tester wont shock while testing the power in house
explain transformer ct connection?
what r the checklist while installing 500 kva transformer
which VFD is better ( LT or HT)
Mention what are the different colors on wires indicates?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible