What is PQA???Applications........
No Answer is Posted For this Question
Be the First to Post Answer
Define rise time.
why select the 3 phase power supply system in electrical system.
What happen if we re-start H.T motor whose rotor is running at 40% rated speed. Is it will damage motor winding?
what is the basic differnce between ground and earth
c. int m = 10; main() { int m = 20; {int m = 30;} printf("%d %d",m,::m); 1. 10 10 2. 10 20 3. 20 10 4. 20 30 5. 30 20 6. None
In which connection the distribution T/F is connected? a) ▲ / Y b) Y / ▲ c) ▲ / ▲ d) Y / Y
What is meant by pilot exciter and its working?
what is the long transmission lines
What do you mean by boost voltage in case of battery charger?
WHAT IS THE DG OIL SPECIFICATIONS AND WHAT IS THE DIFFERENCE BETWEEN THE DG OIL AND TRANSFORMER OIL
At site, we have 30Kw motor (3 phase, 400V,50Hz) and FLC 54A as per the nameplate. At the time of starting it draws 840A instead of 390A (7.2%). As per the data sheet also its 390A starting current. it thru a dol starter from the MCC. can anyone tell what is the problem in the motor
What is the selection & Designing procedure for DG/Transformer
4 Answers Crompton Greaves, Sterling, TATA,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)