Answer / sharlene
If you meant staging(because stagging deals more
with economics),they are are devices used to provide an
elevated working surface. Staging or scaffolding may be of
several different designs and is often constructed to fit
the ship.
Before working on or near any scaffold, workers
should ensure that scaffolds are:
-Safely secured and supported,
-Level,
-Provided with safe access (such as ladders),
-Adequately decked (for example have a work surface and
platform), and
-Provided with guard rails.
| Is This Answer Correct ? | 21 Yes | 1 No |
Answer / svmanojkumar2580@gmail.com
1. A temporary working platform against or within a building for construction, repairs, or demolition.
2. A temporary working platform supported by the temporary timbers in a trench
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / pankaj kumar goel
A temporary platform or system of platforms used for support; scaffolding.
2. The process or manner of putting on a play on the stage.
3. The act of jettisoning a stage of a multistage rocket.
4.
a. The operation of stagecoaches as an enterprise.
b. Travel by stagecoach.
| Is This Answer Correct ? | 0 Yes | 3 No |
How many percentage extra considering in PEB roof sheet ?
which type of instrument included in plumbing work?name of instrument?
what is bond strength .
what is high type road and low type roads
afe or not
what is bond strength of concrete
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What is the difference between Normal Concrete and High density concrete?
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
why the profile of shell of natural draught cooling tower is hyperabolic.
how much quantity of binding wire required for tieing of 1mt of reinforcement bar?
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)