Answer Posted / sharlene
If you meant staging(because stagging deals more
with economics),they are are devices used to provide an
elevated working surface. Staging or scaffolding may be of
several different designs and is often constructed to fit
the ship.
Before working on or near any scaffold, workers
should ensure that scaffolds are:
-Safely secured and supported,
-Level,
-Provided with safe access (such as ladders),
-Adequately decked (for example have a work surface and
platform), and
-Provided with guard rails.
| Is This Answer Correct ? | 21 Yes | 1 No |
Post New Answer View All Answers
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What should be the standard roof height like to be?
How many are the types of joints?
How to come 1.54 from dry to wet concrete?
What is meant by dimensioning?
use ofr concrete as per grade ?
how many shuttering material required for 1000 sq.m built up area.
Define polar co ordinates.
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what will be price of 1:2:4pcc per kg?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
how is the reinforcement is distributed in triangular slab
crank types